+2 votes
8 views

During construction a quantity of water poured for the concrete mix is done roughly just to get the required consistency and it either becomes too much slurry of either too thick 

asked Mar 2 in Civil Engineering by Anjana | 8 views

Your answer

Upload an image:

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
To avoid this verification in future, please log in or register.