0 votes
80 views

Cause is determined to be hydrostatic pressure.  Is bracing enough, or does drainage also need to be addressed?  Alternatively better to address drainage to relieve pressure and epoxy fill cracks?

asked Aug 28 in Civil Engineering by anonymous | 80 views

Your answer

Upload an image:

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
To avoid this verification in future, please log in or register.